Jahrom Gas Power Plant (EPC)
Jahrom   2005 – 2008
Employer                     Tavanir.
Consultant
Main contractor              Tanavob
Quantity

Concrete                        M3      
Structure Fabrication      Ton       
Structure Installation      Ton       
Equipment Installation    Ton       1,200
Welding                          ID         65,000
Cabling                           M         
Field Instrument              Set         
 

Description

Tanavob in this project is EPC Contractor for installation of 954 MW(6*159 MW GTG) power plant in turn key .